Chan Chun Machinery Project Performance

04/2004 – 10/2004 Conveyor System of Aggregate Infill (T210/T220)

04/2004 – 10/2004 Conveyor System of Aggregate Infill (T210/T220)

10/2004 – 05/2005 Maintenance of Working /Construction Trains and Vehicles

08/2003 – 11/2005 Manufacturing of overhead refuse cranes and bulky refuse shear system at Changhua Coastal  Industrial Park

08/2007- 12/2007 Taiwan Power Taichung Power Plant – large cart track replacement work at sea side of unloads the coal wharf 

06/2007- 10/2008 Insert Anchor and Socket Anchor for Dubai Metro Project Red Line

06/2007- 07/2008 Insert Anchor and Socket Anchor for Dubai Metro Project Green Line

04/2010 – 10/2010 Mechanical works for track work related and major equipment for Dubai Metro Project (Green Line)

04/2010 – 10/2011 Direct works for WTB measurement and contact wires replacement with WTB modifications and  lead wires replacement